Completed

Less Mess Storage – Warsaw

Completed

Less Mess Storage – Warsaw

Structure: reinforced concrete, with optimised steel consumption. Envelope: sandwich panels. Floor: reinforced concrete slab serving as a high-quality finished floor. Heating: heat pumps requiring prior boreholes. Equipment: varied storage boxes arranged in line with the delivery and installation schedule.

Specification

  • Status Completed
  • Duration: 11 months
  • Formula Design-build
  • Contractor MBT